Chester Site – CH1

March 1st, 2012

We have also been asked by the client to attend an additional 26 properties.

To replace if defective or re-position the existing distribution amplifiers which are located within the roof space.

Kirby Site – Storrington Ave

March 1st, 2012

We have just completed the first five aerial  installations on the on going development.

St Helens – Chancer Lane

March 1st, 2012

Completed site. We installed 22 houses with aerials on the development.

St Helens – Berwyn Grove

March 1st, 2012

We have also completed the first six installations on the on going developments at one of our St Helens sites.

Rochdale Site – Church Road

March 1st, 2012

We have also completed the first 9 of an on going development at the Rochdale Site.

Oldam Site – St. Marys Way

March 1st, 2012

NorthWest Aerials Ltd are currently in the process of installing 90 aerials at a site in Oldam.
We are pleased to announce that we have just completed the first 33 installations of phase one.

Northwest Aerials Vision and Values

October 17th, 2011

 VISIONS AND VALUES

 

OUR MISSION

To provide a local customer focused service which is reliable and trustworthy. Our traditional values combined with our commitment to our people, foster a work environment that encourages new ideas, new innovations and sustainable growth.

OUR VISION

Our vision is to deliver a quality service to our customers, with teams who are dedicated and work to our values.

OUR VALUES

—We always put our customer first

To always work safely

—We are committed to our people

—We are passionate about our performance

—We always work with integrity

OUR SERVICE

We specialise in design installation and maintenance of domestic and commercial of aerial and satellite systems. The commitment of our local teams enables our business to deliver a service that is tailored to meet the needs of our customers.

Viasat Football

October 17th, 2011

 

NorthWest Aerials LTD

are now supplying and installing Viasat Football systems. Please ring us for a very competitive price.

0161 7931383

The New Bolton College

October 17th, 2011

 

   

 

BOLTON COLLEGE – INSTALLATION OF FOREIGN LANGUAGE TELEVISION SYSTEM.

 

Again we were approached by the Smiths Group who were the electrical contractors working on the new Be-spokeBoltonUniversityBuilding. The client asked them for a foreign language system to be installed and distributed to the foreign language classrooms.

There request for more than 14 foreign language channels, and our solution to this was to install 6 commercial satellite dishes to the roof.

Each one would vary in size and be pointed to the correct satellites to suit the language required.

The cables were then connected to a series of multi-switches in the communications room and then distributed via a Category 5 distribution system to each room.

Mann Island Liverpool

September 26th, 2011

MANN ISLAND

DESIGN AND INSTALLATION OF FREEVIEW AERIAL DISTRIBUTION SYSTEM.

 

Smiths group approached Northwest Aerials Ltd with a dilemma for a new building they had started for BAM Construction. The original design was for the two buildings to have the provision for cable TV only to each apartment. The reason for this was to illuminate any unsightly aerials from the buildings structure. The problem they faced by having Cable TV was any client moving in would have to pay a subscription in order to view the television services. After numerous meetings it was decided it to be unfair for new clients to subscribe to a service they may not want.

 

Northwest Aerials Ltd was asked to design and install a Freeview distribution system for 866 television points but we could only use one television aerial and this could only go on one of the buildings. Also it was requested that the aerial would be as discreet as possible. The aerial was installed and the cable was run down the full length of the building and under the lower ground car park to the electrical riser on floor one of building 2. The cable length was over 180 meters. A suitable filter amplifier was installed which allowed us to control the amount signal to each apartment. We have now just completed the testing and commissioning of building 2 with perfect results.